The Pequea Silver Mines about eight miles south of Lancaster on Route 324 were once operated on and off for a period of more than 200 years. Once worked by four tribes of Indians, today the mines may be explored in safety and comfort. The newest attraction to the Silver Mines is Country Music, performed outdoors by well known recording artists and fine local talent. The Pequea Silver Mines invites you to the kick-ff of the 1980 Summer Concert Season May 25 thru Sept. 28.
Safe Harbor Hydroelectric Development, Safe Harbor Water Power Corporation - The Safe Harbor plant, located on the Susquehanna River 32 miles above the Chesapeake Bay, i sone of the largest hydroelectric "run of the river" dams in the eastern United States. it generates a rated capacity of 417,000 kilowatts, or approximately 1.2 billion kilowatt hours per year, servicing over 1/4 millon families. Original construction was started April 1930, with closure of the dam September 1931, and first generation December 7, 1931. The impounded Lake Clarke is 10 miles long with the dam being 4,869 feet long, 75 feet high with a 55 foot usable head of water for generation. The 1986 $125 million expansion increased the Power House from 638 feet to 1,011 feet, almost doubling the generation capacity. five additional 37.5 mw. General Electric generators were added to the 7 13,800 volt units producing 60 cycle and 25 cycle power.
Safe Harbor Hydroelectric Development, Safe Harbor Water Power Corporation - The Safe Harbor plant, located on the Susquehanna River 32 miles above the Chesapeake Bay, i sone of the largest hydroelectric "run of the river" dams in the eastern United States. it generates a rated capacity of 417,000 kilowatts, or approximately 1.2 billion kilowatt hours per year, servicing over 1/4 millon families. Original construction was started April 1930, with closure of the dam September 1931, and first generation December 7, 1931. The impounded Lake Clarke is 10 miles long with the dam being 4,869 feet long, 75 feet high with a 55 foot usable head of water for generation. The 1986 $125 million expansion increased the Power House from 638 feet to 1,011 feet, almost doubling the generation capacity. five additional 37.5 mw. General Electric generators were added to the 7 13,800 volt units producing 60 cycle and 25 cycle power.