- Collection
- Columbia Bridge Company Collection
- Title
- Columbia Bridge Company Collection
- Object ID
- MG0217
- Date Range
- 1809-1843
, its sides with
weatherboard, and its interior was whitewashed. The structure was modified in 1840 by
the Canal Company at a cost of $40,000 concurrent with the construction of the
Wrightsville Dam. Towpaths of different levels and with sidewalls were added to prevent
horses from falling into river, as